Source description
About the role
Checking of drawing for electromechanical works. Integration and interfacing of the mechanical, electrical and instrumentation system layout for the pumping system project and hydropower project.Preparation of pump house general arrangement drawing for pumping system. Preparation of the Powerhouse general arrangement drawing for pumping system and hydro power plant.
More at GenNext India Private Limited
Related open roles
Backend Lead | IT Industry | Pune
Mumbai · Hybrid
AI/ML Lead | IT Industry | PUNE
Mumbai · Hybrid
Officer - Project (Mechanical)- For API Pharma - Mahad
India
SW Test Lead | AI/ML QA Automation | IT Industry | Pune
Mumbai · Hybrid
Chrono Analyst (Time & Methods)
India
Manager R&D -Special Project Business (Design Engineer) -Pump Industry
Mumbai