Source description
About the role
- Technical Coordination for Systems 3. Operational Integration 4. Safety & Standards Compliance Civil-Systems Interface Management Combined Services Drawings (CSD): Coordinating the creation of drawings that show all systems (piping, ducting, cabling) in a single view to ensure they do not physically collide in the limited space of an underground station or tunnel. Structural Requirements: Ensuring the Civil team provides necessary openings (cut-outs), sleeves, and foundations for electrical panels, transformers, and signaling equipment. Space Management: Managing the allocation of space in the Technical Rooms and tunnel walkways for various contractors. E&M (Electrical & Mechanical): Coordinating the integration of tunnel ventilation systems (TVS) and environmental control systems (ECS) with the tunnel structure. TPS (Traction Power Supply): Managing the interface for Overhead Equipment (OHE) or Third Rail mountings and the grounding/earthing systems throughout the underground stretch. Signaling & Telecomm: Ensuring that signal equipment and antennae locations have a clear line of sight and are protected from electromagnetic interference (EMI). SCADA: Overseeing the integration of remote monitoring systems that connect all mechanical and electrical assets to the central control center. Interface Control Documents (ICD): Developing and maintaining the ICDs, which are formal agreements between two contractors (e.g., Tunneling vs. Signaling) regarding who provides what at the boundary point. Conflict Resolution: Leading meetings to resolve technical disputes when one system's requirements (like a large fire pipe) block another's (like a cable tray). Testing & Commissioning: Coordinating Integrated Testing to ensure that when a fire alarm goes off (Systems), the fans start (E&M) and the trains stop at the correct location (Signaling). Ensuring that all interface designs comply with international metro safety standards (like EN 50126 for RAMS). Verifying that fire-stopping measures are implemented at all points where cables or pipes cross between different fire compartments in the underground station.
More at Larsen & Toubro