Source description
About the role
Responsibilities
-
Lead day‑to‑day technical oversight of utility‑scale LFP BESS assets, including performance monitoring, troubleshooting, and optimization of plant operation.
-
Own the detailed understanding of LFP cell, rack, and container behavior, including degradation mechanisms, operating limits, and optimal charging/discharging strategies.
-
Configure, review, and tune site control parameters (plant controller, PCS, BMS interfaces) to ensure safe operation, grid compliance, and adherence to performance guarantees.
-
Experience with commissioning, performance testing, or root‑cause analysis of BESS or inverter‑based resources.
-
Familiarity with ERCOT interconnection and market rules relevant to battery storage (e.g. telemetry, performance testing).
-
Experience with high‑voltage substations, protection schemes, and grid‑code compliance for inverter‑based resources.
-
Support ERCOT market integration of BESS assets, including understanding of applicable protocols, participation models, and operational constraints.
-
Translate contractual requirements (EPC, OEM, interconnection, offtake, performance guarantees, warranties) into clear technical work structures, procedures, and acceptance/validation tests.
-
Develop and maintain operating procedures, MOPs/EOPs, and runbooks for both normal and abnormal operating conditions, aligned with contractual and regulatory requirements.
-
Analyze site data (SCADA, historian, event logs) to identify performance gaps, root‑cause recurring issues, and recommend corrective actions for LFP batteries and control systems.
-
Collaborate with EPCs, OEMs, control vendors, and SCADA providers to implement control logic changes, firmware upgrades, and performance improvements.
-
Provide technical input into outage planning, maintenance strategies, and lifecycle planning for LFP BESS assets.
-
Support internal and external stakeholders by preparing clear technical documentation, reports, and presentations on system performance and compliance.
-
Education & Experience Required
-
Bachelor's degree in Electrical Engineering, Power Systems, Controls, or related engineering field (Master’s preferred).
-
Minimum 4+ years of direct experience with LFP‑based battery energy storage systems at utility or large C&I scale.
-
Demonstrated experience working with BESS assets in ERCOT (planning, interconnection, operations, or market participation).
-
Strong understanding of LFP battery operations, including SoC/SoH management, thermal management, protection, and safety concepts.
-
Hands‑on experience with site control systems (plant controller, PCS controls, BMS, SCADA), including reviewing setpoints, control modes, and coordination between devices.
-
Ability to interpret and operationalize contractual documents (EPC contracts, OEM warranties, performance guarantees, availability and RTE requirements) into practical workflows and KPIs.
-
Proficiency with data analysis tools (e.g., Excel, Python, or similar) for analyzing operational and performance data.
-
Strong communication skills and ability to work cross‑functionally with operations, commercial, legal, and external partners.
-
Personal Attributes
-
Structured, detail‑oriented, and comfortable translating high‑level requirements into actionable work plans.
-
Proactive problem solver who can work independently in a fast‑moving environment.
-
Strong ownership mindset for asset performance, safety, and compliance.
More at Teksky